Kilambi News
Sunday, November 22, 2026

Archive

Every story, newest first.

Wednesday, November 4, 2026

Life Sciences

Sanofi ends Nurix STAT6 degrader programme in Phase 1

Sanofi has discontinued the Phase 1 trial of SAR448272, the oral STAT6 degrader it licensed from Nurix, and terminated the programme, Nurix said.

Infrastructure

Hut 8 signs second Beacon Point lease, closes $1.07 billion facility

Hut 8 has signed a second 352 MW lease with its Beacon Point tenant, lifting expected base term contract value across its AI data centre portfolio to about $26.6 billion, and closed a $1.07 billion revolving credit facility.

Mining

Ivanhoe cuts Kamoa-Kakula 2027 copper outlook by 19 percent

Ivanhoe Mines cut its 2027 copper production outlook for Kamoa-Kakula in the Democratic Republic of Congo by 19 percent to 300,000 to 350,000 tonnes, and its shares fell 7.2 percent in Toronto on Wednesday morning.

Commodities

Dangote breaks ground on $2.5 billion Namibia fuel hub

Aliko Dangote broke ground on Wednesday on a $2.5 billion fuel depot outside Walvis Bay in Namibia, with a 1,700 kilometre pipeline planned to supply Botswana and South Africa.

Politics

US and China hold annual crisis communications talks in Washington

US and Chinese military officials held their annual Crisis Communications and Prevention Working Group in Washington on November 2 and 3, and agreed on the importance of practical communication measures to reduce risks between the two countries.

Rates

Treasury takes full $4 billion in 1 month to 2 year buyback

The US Treasury accepted the full $4 billion maximum in its November 5 liquidity support buyback of 1 month to 2 year nominal coupons, against $47.319 billion offered.

Infrastructure

QTSII 7.323% notes due 2056 print at 92.6646

QTSII 7.323% Notes due 2056, CUSIP 74690FBA3, printed at 92.6646 at 11:08:31 ET on 2026-11-04, down from a previous print of 98.794992.

Infrastructure

Pentagon lending arm commits $150 million to LeoLabs radar network

The Department of War's Office of Strategic Capital has signed a $150 million conditional loan commitment with LeoLabs, matched dollar for dollar by private co-investment, to accelerate deployment of its ground-based radar network for tracking objects in orbit.

Infrastructure

CoreWeave 2.875% convertible notes due 2033 print at 71.0626

COREWEAVE INC 2.875% Convertible Notes due 2033, CUSIP 21873SAL2, printed at 71.0626 at 10:54:54 ET on 2026-11-04, down from a previous print of 75.554 and 12.86 points below the reference print of 83.9235.

Mining

Earthquake rattles Mosaic's Esterhazy potash mine in Saskatchewan

A magnitude 3.4 earthquake classified as a suspected mining-induced event struck near Mosaic's Esterhazy potash complex in Saskatchewan on Tuesday, and the company said all workers were accounted for and no production disruption is expected.