Western Australia awards $6.16 million in co-funded drilling grants
Western Australia has awarded about $6.16 million in co-funded drilling grants under round 34 of its Exploration Incentive Scheme, supporting 36 applicants across 40 projects.
Every story, newest first.
Western Australia has awarded about $6.16 million in co-funded drilling grants under round 34 of its Exploration Incentive Scheme, supporting 36 applicants across 40 projects.
PC Gold extended all three tested lodes at Spring Hill, a new report puts women at 12 percent of top Australian mining jobs, and Liberia, Namibia and Zambia each surfaced mining governance items.
Lynas has presented plans for a rare earth oxide separation plant in Minas Gerais, tied to its $672 million acquisition of Meteoric Resources and its Caldeira project.
Larvotto Resources intersected high-grade gold-antimony-tungsten mineralisation at four Metz lodes at Hillgrove, including 20.5 metres at 9.4 grams per tonne gold equivalent at Blacklode and a new lode, Echidna.
Horizon Gold returned 44 metres at 5.08 grams per tonne gold from 145 metres at Snook, its strongest result to date, in a 25-hole program at Gum Creek.
Hertha Metals has broken ground on Hertha Chalyx in Conroe, Texas, a roughly $100 million plant designed for about 10,000 tonnes a year of steel-grade and magnet-grade high-purity iron.
Glencore CDIs opened at A$11.44 in Sydney on October 14 and closed at A$11.23, a small premium to the London close, with more than 4 million shares traded.
After eight years in environmental review, Falco Resources expects Quebec to decide on the Horne 5 gold and base metals project by year-end, a project carrying a $3.3 billion net present value against a roughly $200 million market value.
LNG flows from the Persian Gulf remain over 75 percent below pre-war levels, with 21 cargoes exiting Hormuz in September against over 60 before the war, while Australian coal trades at $5.40 per mmBtu against spot LNG at $26.
MISC accepted a Petronas award for five more LNG carriers on 20-year charters from 2030, Sweden released the sanctioned tanker Sea Owl 1 after seven months, and Gulf producers prepared to restore output shut in by Hurricane Isaias.